Antioch Baptist Church
Miller Brothers provided preconstruction and construction services under a guaranteed maximum price contract (GMP) to keep within the church’s budget. The team succeeded in bringing the price down considerably from the original estimates, allowing the church to move forward with Phase I construction.
Antioch’s Ministry Building has three levels with an elevator. The upper two levels house the foyer, ministry office, classrooms, computer lab and a warming kitchen while the lower level is suited for future expansion and storage areas. The new building retains the character of the existing church. Constructed with a concrete foundation, steel frame, masonry walls, wood trusses and an asphalt shingle roof, it has a decorative brick exterior with inset and vertical brickwork, and arches throughout.
The church received back over $1 Million dollars in shared savings.
Location
Owner
Architect
Sturgeon Studios, PLC
MBI Service
41,770 s.f. Reconstruction and General Contracting